Showing posts with label mitts. Show all posts
Showing posts with label mitts. Show all posts

Thursday, October 4, 2007

Taking the plunge

I think I mentioned I signed up for the Fingerless Mitts for Fall knitalong. Of course, I hadn't picked up either pair of unfinished mitts from last year until last night. I had wanted to finish my Woolgirl Waterfall sock before taking on (or reviving) another project.

Well, last night, I "finished" my first Woolgirl Waterfall sock. By "finished" I mean finished the toe but for the grafting, tried it on, found it to be 2-4 rows too long, and promptly ripped out the toe. At that point, being after 10 p.m., I wasn't really in the mood for knitting, trying on and reknitting the toe the usual 3 or so times it takes me to get it right (despite having my foot measurements and measuring the sock for accuracy), so I decided to pick up the Mac & Me Lobster Claws fingerless gloves. In short, as I discussed here, I knit the left mitt wrong and have to rip it all out. I almost have the nerve to do it, now that I've started the right (as in "right hand" and "correct") mitt. It's a fast knit, so I'm not so nerved up about it. Here are some photos.

First, the left and wrong mitt (the pattern says to knit the first six rows and then join to knit in the round, while I knit it all in the round, which makes it difficult to knit the ruffle, which is also knit flat):




Next, the right and right mitt (notice the split at the base of the mitt, which is where the ruffle and button closure will be):



That's another one of my yummy project bags from Piddleloop.

Oh, and for added fun, the pattern calls for knitting the hand on US 4 (4.0 mm) long dpns and the fingers on the same size short dpns (while keeping the hand on the long dpns). It actually is fun except when one discovers at 11 p.m. that one's long dpns are US 4 (4.25 mm) and the short dpns are US 4 (4.0 mm), even though I apparently never noticed that when I knit the first mitt. And after swatching, I get gauge on the 4.25 mm and am a little short on the 4.0 mm. So I decided I'll just knit the fingers a little looser. But from now on, I'm definitely going by metric measurements for needles (I'm already sensitive to the issue with socks, so it's not a big deal).

By the way, the Lobster Pot cashmere is a dream to knit with!

And on a completely different topic, the boys have given up their nap, Boy M runs hot in temper, temperament and temperature (the boy was beet red and sweaty in our unseasonable heat, never mind the angry and demanding attitude), and all three are deciding to test their independence and explore oppositional behavior. You know, things like Boy M angrily shouting "Mom!" each time he wants my attention and stamping his foot to punctuate it; Boy E biting his brothers if he does not like what's going on; and Boy J crying when his brothers get disciplined for something like biting or kicking, or willful disobedience, and while doing so, trying to convince me that the egregious behavior did not occur (although when offered the option to stay home with Boy M who could not run an errand with us as the consequence of naughtiness, he quickly stopped crying and arguing--a lawyer in the making, that one, guess it's in the blood). I'm exhausted, but relieved I can escape into my knitting!

Sunday, September 30, 2007

Project mojo update

Well, I ran into a little trouble on the Waterfall socks, but nothing I would consider to be another full-out departure of the mojo. I had trouble figuring out the last two short rows turning the heel. So I emailed Jen at Woolgirl, and she was ever so helpful, as it took two emails to figure out the problem. Or mostly figure it out--I pretty much just fudged it. But after I turned the heel and knit half the gusset, I realized I knit the heel two rows less than the pattern called for, and I felt I needed those two rows. So I worked my way backwards, and along the way, dropped a yarn over somewhere in the instep and ended up having to rip back to the almost-beginning, specifically, the five rows of stockinette that precede the start of the pattern on the cuff. But I didn't feel that bad about it, I mean, it's sportweight, so it knits quickly, and the pattern isn't that hard, and I'm enjoying it. So now I'm working my way down the instep; I think I'm about halfway to the toe. And I'm LOVING the yarn! Unfortunately, I have no pictures. Today's excuse is that I have a new computer--I've gone iMac--and I have to figure out how to download pictures into iPhoto in a way that makes sense, as opposed to the way I did it the first time, which produced an album of 300 or so photos.

Next project: the Tulip Cardigan. I'm working the applied i-cord trim on the sweater. I'm just about to negotiate the turn from the left front to the bottom, and I need to be clear in the head because I think there's casting on and slipping stitches involved, which doesn't seem that complicated during the day, but this project has become a strictly after-11 p.m. project (the only time I have to give it undivided attention), and I'm definitely not clear in the head at that time. Fortunately, I haven't made too many mistakes so far, but most of them happen as I start to fall asleep over the needles. But I've got to get going: there's another baby due in November that I have to knit for. And we don't know what it is, so I'll likely have to knit two sweaters. I'm jonesing to cast on the Wee-one Welcome Set sweater--I have boy and girl colors in Cider Moon--but I have so much else on the needles, I don't feel like I can justify it.

The Popover Mitts and the Mac & Me Lobster Claws fingerless mitts are both on the to-do list; I even joined the Fingerless Mitts for Fall knitalong. But I can't bring myself to start them. I have to find my place on the Popover Mitts (and I had found some errors in the pattern last fall when I started them), although I'd like to have them done by Stitches East, since I bought them last year at Stitches East. And unfortunately, I have to rip out the finished (or nearly-finished) Lobster Claw because I knit it wrong from the beginning. If I recall correctly, the first 5 or so rows should be knit flat and then joined, and I started off working in the round, which I would ignore, except the ruffle is knit flat and closes with a button, and I think it would be hard to pick up the stitches for the ruffle if the mitt is joined in the round. I haven't had the heart to rip it out yet, but I'm getting ready, especially because I know it knits up really quickly. I just hate to totally frog something.

The Summer Solstice socks are languishing. The project bag just sits and looks at me every time I get into bed. I'll be back!

The Decadent Fibers baby blanket saw some knitting time last week, but it's back in the ongoing project basket. Baby sweaters move more quickly.

And I've just about committed to totally frogging my Scarlet Fleece sock. It's a big deal--I've never totally frogged a project. I find the idea scary--I'm assertively abandoning a project--and intimidating--it's been dormant on the needles since March or so, and the yarn will be all crimped. Will I have to wash it?

I'm also going to frog the Perchance to Knit Irises sock. I need to switch needles, I'm sure I'll have to re-swatch, and I'm just not in the mood. But I'll just cut off the inch or so of ribbing and throw it back in the back with the yarn, to be used if only I run low on yarn.

The Morehouse Farm sweater still needs its sleeve, and it's almost cool enough to knit. It will be a quick knit, too--I've just got to get to it.

So, I think I got most of what's on the needles. (No, I'm not counting the Mountain Colors Cardigan that I bought approximately 10 years ago that's sitting in the attic, or the Babette crochet blanket, also in the attic). Goodness, is that 9 projects?! I definitely have to finish a Waterfall sock so that I can justify casting on the Wee-one sweater! And I have to finish one set of fingerless mitts before Stitches East. Even though I want to cast on for fingerless mitts in Halloween colorways! I think I have a problem.